Site visitors book
The arrival and departure of all visitors to a construction site must be recorded in a site visitors book. This is to ensure that site management have an accurate and up-to-date record of persons on site in case of an emergency.
This book should be prominently displayed at the reception of the site offices. Signing in and out of the book will usually be a visitor’s first and last interactions with the site. Details that may be required include:
- Name.
- Organisation.
- Name of person being visited.
- Email address and/or phone number.
- Car registration number.
- Time of arrival.
- Time of departure.
The book enables fire marshals to account for everyone in the event of an evacuation. It can also be useful if there are incidents on site, and as a record of visits.
The book should be robust and durable as it will be subject to frequent use. Some books contain detachable passes for visitors to wear while on the site, which helps to increase security.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.





















Comments
garbage collection